The short answer

Porosity, cold shuts, flash, shrinkage, hot cracks and die soldering cause most die casting rejects. Start with the void shape: round voids are gas from venting and shot profile, jagged voids are shrinkage from feeding and wall design. Cut a section before changing any parameter.

The defect map

Die casting has a short list of failure modes and a long list of causes, and the useful way to organise them is by mechanism rather than by name. Filling defects happen when metal arrives cold, slow or turbulent: cold shuts, misruns and gas porosity all come from that family. Feeding defects happen after the cavity is full, when the casting contracts and there is no liquid metal or pressure to follow it: shrinkage porosity, sinks and hot cracks. Tooling defects come from the die itself: flash from a parting line that no longer closes, soldering from a die face that is too hot, heat checking from thermal cycling. Almost every defect a buyer sees on an incoming inspection traces back to one of those three families, and the fix is different for each.

Matrix of eight die casting defects with mechanism and first fix: gas porosity from air trapped during fill fixed by venting and vacuum, shrink porosity from missing feed fixed by intensification, cold shut from cold metal fronts, misrun from early freezing, flash from clamp and die wear, hot cracks from uneven contraction, soldering above 400 degrees Celsius and blisters from gas under the skin
Read the middle column first. Two defects that look alike on the surface often have opposite causes, which is why parameter changes made without a diagnosis usually make things worse.
DefectWhat it looks likeUsual causeWhat to change
Gas porosityround internal voids, blisters after heat treatmentair or gas trapped during fillventing, vacuum, slower slow-shot, less lubricant
Shrink porosityjagged voids, sinks on thick sectionsno feed during solidificationhigher intensification, longer hold, uniform walls
Cold shutvisible seam or line where fronts metmetal too cold, fill too slow, long flow pathpour temperature, gate velocity, die preheat
Misrunincomplete corner or thin ribmetal freezes before the cavity fillspour temperature, fill speed, venting
Flashthin fin at the parting line or slidesclamp too low, die worn, pressure spikeclamp tonnage, die recondition, shot profile
Hot crackcrack at a sharp transitionuneven contraction, poor ductilityradii, wall uniformity, alloy choice
Solderingrough torn patch, die damagedie face above about 400 Ccooling, spray coverage, surface treatment
Blistersurface bubble after T6 or service heatgas just below the skindegas the melt, vent, use T5 instead

Porosity: gas or shrinkage, and how to tell

Porosity is the defect that consumes the most meeting time, and most of that time is wasted because nobody has looked at the void. Cut the part through the suspect section and examine the cavity at magnification. A round void with smooth walls is gas: air or vapour was trapped during filling and could not escape before the metal froze. A jagged, irregular void with dendritic edges is shrinkage: the metal contracted as it solidified and there was no liquid metal or pressure available to fill the space it left. The two need opposite corrections, and a parameter change made without that one check has roughly a fifty percent chance of being wrong.

For gas, the chain is venting, vacuum and shot profile. Vents and overflows belong at the last-filled areas, and the total vent area should be a meaningful fraction of the casting's projected area rather than a token slot; a common target is above 0.5 percent. Where the part is pressure-tight or the wall is thin, vacuum assistance removes the air before the metal arrives. The slow-shot stage should advance the metal without folding air into it, typically 0.1 to 0.3 metres per second, and the fast stage then fills the cavity before the front freezes, typically 35 to 60 metres per second. Lubricant is part of the same system: an over-sprayed die releases gas that has nowhere to go, so a fine atomised spray that leaves the surface slightly damp, not wet, is the target.

For shrinkage, the chain is intensification, hold time and wall design. Intensification pressure of roughly 40 to 70 MPa, applied before the gate freezes, keeps feeding the casting as it contracts; hold time should cover most of the solidification time of the thickest wall, commonly 2 to 6 seconds. Neither will rescue a part designed with a 6 mm boss beside a 2 mm wall, because the thick section solidifies last and isolated. Coring the boss, adding cooling at the heavy section and keeping walls within about 2 to 1 is the design-side fix, and it is always cheaper than process compensation.

Range chart of die casting temperature windows in degrees Celsius: aluminium pour at 670 to 700, aluminium die face at 180 to 250, zinc pour at 390 to 430, zinc die face at 180 to 230, magnesium pour at 640 to 680 and the 400 degree onset of aluminium soldering on steel
Most defects start at the edge of a window rather than in the middle. A die running at 150 C has cold-shut risk; one running at 320 C has soldering and heat-check risk.

Thermal balance is the root cause most people skip

Die temperature decides fill, solidification and die life at the same time, which is why it is the first thing an experienced die caster checks and the last thing a buyer hears about. Aluminium dies normally run with a face temperature of 180 to 250 degrees Celsius at steady state. Below that range, metal freezes on contact, cold shuts and misruns appear, and intensification cannot reach the cavity. Above it, the release agent breaks down, aluminium starts to react with the steel, and soldering begins; the reaction becomes aggressive above roughly 400 degrees Celsius at the die surface, which is why local hot spots do the most damage.

Thermal balance is also a geometric problem. A die with a thick steel mass on one side and a thin core on the other will run hot on the heavy side and cold on the thin side, no matter what the controller says, because the heat input and the cooling capacity are not matched. The fixes are cooling lines placed by thermal simulation rather than by convenience, baffles or bubblers in deep cores, and a spray pattern that actually covers the hot zones instead of the whole face evenly. Where a die is chronically out of balance, a die coat or a local insert of high-conductivity material is often more effective than another round of parameter tuning.

Defects that process settings cannot fix

Some defects are designed in. Sharp internal corners concentrate stress and start hot cracks; generous radii at every transition are the cheapest fix in the whole process. Abrupt wall changes create isolated heavy sections that cannot be fed, so a gradual transition over at least three times the thickness difference is better than a step. Deep, narrow pockets need long thin cores that bend and run hot, so they should be widened or split. Undercuts add slides, and every slide adds a parting line that can flash and a surface that can solder.

Heat treatment belongs in the same category. A T6 treatment on a casting with uncontrolled porosity turns trapped gas into blisters, because the gas expands at solution temperature and pushes the skin out. Where porosity cannot be eliminated, T5 ageing gives most of the dimensional stability with much less blister risk, and vacuum impregnation can seal micro-porosity in non-structural, pressure-tight parts such as housings and valve bodies. Neither is a substitute for a sound casting, but both are legitimate routes for a part that is otherwise correct.

What to specify and what to inspect

A die casting purchase order that says "no porosity" is unenforceable, because no process delivers it. What works is a specification by zone and function: structural sections and pressure boundaries get a defined porosity level verified by X-ray or sectioning, cosmetic faces get a surface acceptance standard, and non-critical sections get the general level. State the inspection method and the sampling frequency, because a visual check and a radiograph answer different questions. For pressure-tight parts, state the leak test pressure and the acceptance criterion, and decide in advance whether impregnation is permitted.

On the process side, ask for the shot profile, the die temperature record and the die maintenance interval, and ask how the supplier verifies that intensification is reaching the cavity. A supplier who can show those three things is controlling the causes; one who can only show final inspection is controlling the symptoms, and the symptoms will move to the next order.

Four step porosity diagnosis flow: cut a section and read the void shape, round voids mean gas so check vents and the shot profile, jagged voids mean shrinkage so raise intensification and even the walls, then X-ray the next thirty shots to verify the correction
The loop is deliberately short. One sectioned part and thirty verified shots resolve most porosity arguments faster than a week of parameter changes.

See die casting for the process and the alloys behind these defects, aluminium die casting for housing and bracket work, and surface finishing for the coating steps that follow casting and can hide or reveal a surface defect.

Scope and sources. The distinction between round gas voids and jagged shrinkage voids, the troubleshooting order that starts with a sectioned part, the effect of venting and overflow design, the 400 degree Celsius onset of aluminium soldering on steel and the use of vacuum impregnation are set out in a die casting defect and prevention guide. The slow-shot range of 0.1 to 0.3 metres per second, fast shot of 35 to 60 metres per second, pour temperature of 670 to 700 degrees Celsius, die temperature of 180 to 250 degrees Celsius, intensification of 40 to 70 MPa, hold time of 2 to 6 seconds, clamping of 40 to 70 kilonewtons per square centimetre of projected area and vent area above 0.5 percent of projected area are from a review of aluminium die casting parameters. The H13 die life of 100,000 to 300,000 shots for aluminium, the T5 against T6 blister risk, the 0.5 to 1.0 mm machining allowance and the cavity-count guidance are from a die casting design and defect prevention guide. These are typical windows; the correct settings for a specific die are established on its own trial shots.